How PropDetect estimates refurbishment costs

The refurbishment estimate is the figure customers tell us matters most, because it is the one that usually goes wrong in the other direction from safety: underestimate the works and the deal you bought is not the deal you priced. It is also the figure our users have checked hardest against reality, and the early evidence is on the page below.

This page explains how the estimate is built: what the AI looks at, how each room is judged, where the prices come from, and what the estimate cannot see. The calibration data and the way the judgement is tuned are ours and stay off the page.

What the AI actually looks at

The analysis reads the listing photographs, the floor plan and the EPC document together. The floor plan establishes which rooms exist and how big they are; the photographs establish what state each of them is in; the EPC establishes the energy fabric: heating, glazing, insulation and the works needed to reach a lettable standard.

Nothing is priced from a description. Agent copy says "scope to modernise" about everything from a dated kitchen to a shell, so the estimate is built from what is visible, not from what is written.

Room by room, element by element

Each room is judged element by element: walls, ceilings, flooring, fixtures, electrics, and the room-specific items, units and worktops in a kitchen, sanitaryware in a bathroom. Each element is judged as keep, refresh or replace based on what the photographs show, and only the work that is actually indicated gets priced.

This is the discipline that separates a costing from a guess. A clean, recently fitted kitchen is costed at zero. A dated but functional bathroom is a refresh, not a rip-out. A wreck is a wreck and gets priced like one. Flat-rate-per-square-metre tools cannot make these distinctions, which is why they price a tired but sound three-bed the same as a gutted one.

Regional rates, calibrated against real quotes

The same bathroom does not cost the same in Bolton and in Brighton. Every line is priced at regional labour and material rates, and those rates are continuously calibrated against real builder quotes from real projects, which is why the estimates track what builders actually charge rather than a national average. The rate base was originally built from builder quotes collected over a six month effort across the country, and on top of the continuous loops the rates are reviewed monthly against RICS cost data and a market view of material and labour costs. The calibration process and its data are proprietary; the effect of it is checkable on any report.

On the record so far: one customer's builder quoted 14,500 pounds against our 14,800 pound estimate on the same property. Another customer who prices work with builders on every deal reports our estimates landing within 500 to 1,000 pounds of actual quotes. Early evidence from real projects, stated as exactly that, and a systematic study will be published when enough actual project costs have been collected to compute one.

EPC works and overheads, separated and triggered

Energy works are costed on their own line, from the EPC: what it takes to reach a lettable rating, separate from the cosmetic works, so a landlord can see the compliance spend and an investor can see the condition spend without the two blurring.

Overheads are added only when the evidence indicates them. Scaffolding appears when there is visible work at height. A damp and timber survey appears when the photographs suggest moisture. A rewire or replumb appears when the visible installations look end-of-life. And a 15 percent contingency is always carried on top, because photographs cannot see behind walls, and pretending they can is how refurb budgets fail.

Everything editable, and the system learns

Every line is editable, and edits recalculate the whole appraisal. If you know your builder does bathrooms for less, change the line and the deal updates. Those corrections also feed the calibration, so the estimates improve with use across the base.

How this differs from other tools

Most tools in this market either apply a flat rate per square metre, quote wide ranges like 15,000 to 25,000 pounds, or leave refurbishment out entirely and let you guess. A photo-driven, element-level, regionally calibrated estimate with the reasoning attached is the thing customers consistently name as the reason they use PropDetect, including evaluators who did not buy for other reasons. It also spares a working relationship: you stop asking builders for quotes on properties you will never own.

The limits, stated plainly

  • The estimate cannot see what the photographs do not show: hidden damp, a defective roof photographed from its good side, anything behind closed doors. This is precisely why the contingency is always carried and surveys are flagged where the evidence suggests them.
  • Sparse or stale listing photography degrades the estimate, and rooms missing from the photographs are estimated from the floor plan and the property's overall condition, which is stated on the report.
  • Full extension and conversion modelling, pricing a rear extension or loft conversion you plan to add, is partial today and being built. If the deal depends on major structural additions, price those with a builder.
  • No measured error rate is published yet. The two datapoints above are real and on the record, and they are two datapoints, not a distribution.

Frequently asked questions

How does PropDetect price a refurbishment from photos?

The floor plan establishes the rooms, the photographs establish each room's condition, and every element is judged keep, refresh or replace, then priced at regional rates calibrated against real builder quotes. EPC works are costed separately, overheads are triggered by what is visible, and a 15 percent contingency is always carried.

How accurate are the estimates?

The evidence on the record: a builder quote of 14,500 pounds against our 14,800 pound estimate, and a customer who prices with builders regularly reporting estimates within 500 to 1,000 pounds of actual quotes. That is early evidence, not a measured error rate, and we say so until a systematic study exists.

What does the estimate include?

Room-by-room works, energy works to a lettable EPC standard on a separate line, evidence-triggered overheads such as scaffolding or a rewire, and a 15 percent contingency. Figures are shown with and without VAT, and every line is editable.

Can it price an extension or loft conversion I am planning?

Partially. The HMO mode flags conversion potential within the existing envelope and prices that work. Pricing planned structural additions, a rear extension, a full loft conversion, is being built and is not reliable enough to lean on yet, so we say so rather than pretending.

Last reviewed 4 September 2026. Claims on this page trace to our internal evidence register.